Enen - Education hub
Course
Open

DEDICATED TECHNICAL SUPPORT CENTER (TSC) / SHIFT TECHNICAL ADVISER (STA) TRAINING for EMERGENCY OPERATING PROCEDURE (EOP) SUPPORT. Operations Training Programs

DEDICATED TECHNICAL SUPPORT CENTER (TSC) / SHIFT TECHNICAL ADVISER (STA) TRAINING for EMERGENCY OPERATING PROCEDURE (EOP) SUPPORT. Operations Training Programs

About this course

The teaching approach combined classic presentations where the physical aspects of the most important EOP recovery strategies are presented and explained with Case Studies, which put the attendees in situations for which they have to come up with answers to operator initiated questions or advises. The Plant Engineering Staff (PES) Cases Studies in the following agenda are intended to provide information on the possible evaluations that a Technical Support Center (TSC), Shift Technical Adviser (STA) or Plant Engineering Staff (PES) would have to perform to support control room operators in case of accidents. This includes evaluations concerning:

  • RHR suction alignment.
  • Need to transfer to hot let recirculation.
  • Establishing RCS letdown or not, Venting RV head or not.
  • Post-SGTR cooldown method.
  • Control of sump pH, SG overfill.
  • Which SG to use for cooldown.
  • Reinitiation of feed to a dry SG.
  • RCP status, Long term plant status.

DAY 1:

  • Symptom-Based Emergency Operating Procedures – Introduction.
  • Diagnostic.
  • SI Termination & Reinitiation Criteria.
  • EOP Evaluations by TSC or Plant Engineering Staff.
  • Loss of Coolant Accident Physics in relation with Break Size.

DAY 2:

  • RCP Trip/Restart Criteria.
  • SI Reduction Criteria.
  • Case Study 1 – Small Break LOCA.
  • Case Study 2 – Large Break LOCA.

DAY 3:

  • Shutdown LOCA.
  • Case Study 3 – Stuck Open Safety Valve Case.
  • Study 4 – LOCA Outside Containment.
  • Pressurized Thermal Shock Aspects – FR-Ps.

DAY 4:

  • E-3, Steam Generator Tube Rupture.
  • SGTR Contingencies.
  • Case Study 5 – SGTR.
  • Case Study 6 – Faulted & Ruptured SG.
  • Return to power & ATWS.

DAY 5:

  • Case Study 7 – Anticipated Transient Without Trip.
  • Total Loss of Feedwater & Bleed and Feed.
  • Case Study 8 – Loss of Secondary Heat Sink.
  • Case Study 9 – Degraded and Inadequate Core Cooling.
  • Instrumentation Response in Accident Conditions.


Specific Details

Program Type:
Specialisation

Schedule

Not specified

Frequency

On Demand

Application details

To register, please click on this Link

Details

ID: 4951
Language:
English
Start/End:
1 Jan 2026 / 31 Dec 2030
Duration:
40 hours
Application Deadline:
31 Dec 2030
Modality:
Face to Face
Apply to this Course Add to Favourites

Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or European Commission. Neither the European Union nor the European Commission can be held responsible for them.

© 2026 - enen.eu